Currently working on the Garden City (covering 74 miles) and Boise City (covering 180 miles) for address verification.
Structure points for GPS, and FOC, DW, SW determination using point
clouds captured by the MX2 mobile.
Operating Unit:
Quanta Telecommunication Services
Work:
Trident / POSPac Operation
Division:
QTS, Div. 11, Arizona Office
Actual Man-hours:
On-going
Projects Details
Trident / POSPac Operation
Deliverables:
Operated 286-mile road using POSPac and Trident software thru MX2equipment.
Worked on 31 missions with 215 runs across Atlanta area to be used for
exporting shape and drawing files needed in permitting works.
Reducing site workers for manually capturing data in the field.
Work:
Trident / POSPac Operation
Division:
QTS, Div. 10, Atlanta Office
Actual Man-hours:
8,009 man-hours
Atlanta
Deliverables:
Completed base map drawing including roads, street names, curb & gutters, driveways, sidewalks and dimensions for the following area:
Columbia – 111 miles covered
Shakespeare – 145 miles covered
Project:
Atlanta
Area:
Columbia, South Carolina
Actual Man-hours:
1,920 man-hours
Atlanta
Deliverables:
Completed base map drawing including roads, street names, curb & gutters, driveways, sidewalks and dimensions for the following area:
Greenville – 138 miles covered
Pickens County – 193 miles covered
Project:
Atlanta
Area:
Greenville, South Carolina
Actual Man-hours:
2,345 man-hours
BTC (Brantley Telephone Company)
Deliverables:
Created the complete base map drawing requirement i.e. centerlines, right of way, C&G, road names and surfaces, and building structures, located in the State of Georgia.
Area:
Brantley area – total of 300-sheet route for Backbone GDOT, Lake Paxton, Spring Lake, Pinckney Church and Camp Pinckney.
Homeland area – total of 120-sheet route for fiber design run.
Project:
BTC (Brantley Telephone Company)
Actual Man-hours:
1,077 man-hours
Gibson EMC
Deliverables:
Produced 4,451 drawing deliverables (11”x17” size drawing sheets) for Gibson EMC (Electric Membership Corporation) located in Tennessee. Scope of design work include are Viewport Creation, T1 and T2 Splitter placement, Fiber Count and As-built for the following areas:
Area:
Ridgely
Mt Zion
Rutherford
Tiptonville
Trenton Area South and North
Gadsden Area
Project:
Gibson EMC
Actual Man-hours:
5,373 man-hours
Hargray
Deliverables:
Outlined and drawn layouts for roads, driveways, sidewalks, street names and FOC for Rockdale County, Newton County, Peachtree Corners, and Covington
& Conyers situated in Georgia.
Area:
Rockdale County 48-mile long road
Newton County 33-mile long road
Peachtree Corners 10-mile long road
Tiptonville
Covington and Conyers 4.2-mile long road
Project:
Hargray
Actual Man-hours:
957 man-hours
Projects Details
Small Cell, Alaska
Deliverables:
Accomplished the submission of poles for small cell towers, with different auxiliary attachments, situated in Anchorage, Alaska, and arrived in 100% completion as per Client’s requirement and engineering schedule for the following (147 Poles and 3,096 Sheets):
Poles:
ML&P poles – 35 plans with 735 sheets
CEA poles – 65 poles with 1,374 sheets
MOA poles – 47 plans with 987 sheets
Project:
Small Cell, Alaska
Actual Man-hours:
1,567 man-hours
Projects Details
Bell, Canada
Deliverables:
Completed a total of 40 FSAs (Fiber Serving Area) for communities located in Canada comprising of 21,011-unit residential homes, multi-dwelling units, and commercial establishments with 2,795 deliverables (11”x17” size drawing sheets) produced for Valard Telecoms particularly Bell FTTH Projects. The scope of design work for these communities include High Level Design, Permits, and the detailed 400 Series Drawings:
ULA, Utility Alignment Permit, drawings delivered from the above telecommunication Clients with 235 Homes Passed, and total of 442 sheets output.
Clients:
Shaw Communications,
BNS Telecoms,
Northwestel,
Rogers Communications
Actual Man-hours:
1,106 man-hours
Projects Details
Lake Hancock Solar /
Grange Hall Solar /
Sun Stream Solar /
Phoebe Substation
Deliverables:
Checked all IFR (Issued for Record) drawings i.e. one-line diagram, AC/DC schematics, internal/external wiring, and the like for electrical and instrument connection in the following substation: (Total of 507 sheets - 11x17 examined )
Projects:
Lake Hancock Solar
Grange Hall Solar
Sun Stream Solar
Phoebe Substation
Actual Man-hours:
567 man-hours
Projects Details
Quanta Pipeline and Services Engineering
Deliverables:
Completed the As-built mechanical plans and details, P&ID drafting, ISO, and grounding plans for the QPSE counterpart:
Projects:
Summit Midstream – Blue Quail Station
USA Compression – Station Energen Dickenson & Tiger
MTS – As-built Model Revision
USA Compression – Money Graham / Cypress / Pliny the Elder / Nailed it
Kinder Morgan – Station 563 & 875
Salt Creek – Coyote
Salt Creek – Miso CS
Salt Creek – Black Marlin
USA – Pliny the Elder
USA – OXY Salt Flats
USA – Headwaters
Actual Man-hours:
Projects Details
Underground Construction Company, Inc
Deliverables:
Submitted the Overview and Location Maps for the following project name under UCCO counterpart:
Projects:
C-771 San Francisco (40 man-hours, 11 sheets)
C-765 De Anza (40 man-hours, 8 sheets)
C-769 Milpitas (40 man-hours, 8 sheets)
C-768 Hollister (16 man-hours, 6 sheets)
Actual Man-hours:
Underground Construction Company, Inc
Deliverables:
Preparation of exhibit drawings for pipeline and right-of-way (ROW) permitting
Projects:
Modesto – Yosemite
Merced-Yosemite
Kern 1
Mojave
Hinkley
Humboldt 1
Napa 1
San Benito 1
Santa Clara
Stanislaus
Amador
Fresno
Humboldt 2
Kern 2
Madera
Marin
Mendocino
Merced
Monterey
Napa 2
San Benito 2
San Francisco 1
San Joaquin
San Luis Obispo
San Mateo
Santa Clara
Santa Cruz
Solano
Sonoma
Stanislaus
Actual Man-hours:
Projects Details
Performance Energy Services
Deployed Work pack engineer in off-shore of Israel for the Leviathan project, which is the largest energy project in the State of Israel to deliver commercial gas sales to its domestic and regional markets, for the following job involvement:
Scope of Work:
Monitoring status of the pre-developed work packages during the hook-up/ construction stage.
Preparing Site Instructions whenever required for the construction.
Keeping track on offshore construction materials availability with onshore counterparts.
Updating & submitting Daily Construction Progress Reports, PES Crew Daily Project Timesheet and General Personnel-On-Board Report.
Maintaining all Records & Documents which are to be submitted at the conclusion of
the project.